Posts that, in my personal judgement, create too much conflict in the community, may be deleted - If members repost the same topic, they may be banned from future posts - Even though I have disabled the Registration, send me an email at:  vtgrandpa@yahoo.com if you want to register and I will do that for you
Posts: 46159 Topics: 17667 Members: 517
Newest Member: Christy25
*
+  Henry Raymond
|-+  General
| |-+  General Discussion
| | |-+  The cost of paving Route 104 $2,987,387.00
« previous next »
: [1]
: The cost of paving Route 104 $2,987,387.00  ( 4365 )
David Shea
Sr. Member
****
: 471


« : September 18, 2009, 01:09:58 PM »

   
Fairfax-St.Albans Town STP 2217 (1)    Request Date: 7/23/2009 9:36:48 AM
Open Date:
Closing Date: 8/14/2009 11:00 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
   Close Window

Agency of Transportation - Contract Administration

One National Life Drive
Montpelier,  VT 05633-5001

Bid Type:
Job Contract

Locations:
Franklin
Keywords:
Construction (Non Building)

Bid Description:
LOCATION: BEGINNING IN FAIRFAX ON VT ROUTE 104 AT MM 6.883 AND EXTENDING NORTHERLY A DISTANCE OF 61,528 FEET (11.653 MILES) THROUGH THE TOWNS OF GEORGIA & FAIRFIELD TO MM 4.110 IN THE TOWN OF ST. ALBANS. TYPE OF CONSTRUCTION: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES RESURFACING OF THE EXISTING HIGHWAY WITH A LEVELING COURSE AND WEARING COURSE, NEW PAVEMENT MARKINGS, GUARDRAIL, SIGNS AND INCIDENTAL ITEMS AS SHOWN IN THE PROJECT QUANTITIES. ENGINEER'S ESTIMATE: CATEGORY E. COST OF PLANS: EIGHTEEN DOLLARS AND NO CENTS ($18.00)
Special Instructions:
Awardees
FRANK W. WHITCOMB CONSTRUCTION CORPORATION
   8/25/2009    
187 Whitcomb Road
Walpole, NH
   $2,987,387.00    
      
 
Mike Raburn
Hero Member
*****
: 2565



« #1 : October 02, 2009, 08:40:41 AM »

Hope asphalt costs stay about the same.
They cannot fluctuate THAT much, can they?
I have never bid or worked a large asphalt job.

I guess this starts next spring?
trussell
Hero Member
*****
: 870



« #2 : October 02, 2009, 09:36:59 AM »

Next spring? Oh not at all! They've finished the first coat and are doing the ditch work now.  I'm not sure if the 2nd layer of asphalt will go on now or wait until spring.

"A life is not important except in the impact it has on other lives." -Jackie Robinson
mary
Newbie
*
: 32


« #3 : October 02, 2009, 04:46:31 PM »

Prices always seem high to me because I'm getting old.  Always thought asphalt prices varied drastically over time as the petroleum prices fluctuate so dramatically. Am impressed with the work & workers on the project. Great to see all ditch work and stone going into them.  Always appreciate friendly touches. I pass the same workers at least twice a day. Smile & mouth good morning & they give me a little bow & wave me out onto the road. Nice way to start the day.   
mmillette
Newbie
*
: 41



« #4 : October 19, 2009, 09:18:23 PM »

I don't think they can put the 2nd phase down unless the surface temp is 60 degrees F.