[700x467] [1800x1200]
Stan Jenkins, Pat Pigeon, Bill Ormerod, Jeff Blake & DJ Leach clear footing & key of mud & water in preparation for the installation of the bridge - Picture 3751
Viewed: 1285 times.
|
[700x467] [1800x1200]
Bill Ormerod & Stan Jenkins fill sand bags and not quite sure what project Pat Pigeon has in mind - Picture 3750
Viewed: 1258 times.
|
[700x467] [1800x1200]
The Crew unloads first of 4 parts to the main culvert - Picture 3749
Viewed: 1192 times.
|
[700x467] [1800x1200]
Bill Ormerod & Stan Jenkins still filling sand bags as part one of the bridge is placed on the ground - Picture 3748
Viewed: 1155 times.
|
[700x467] [1800x1200]
DJ heads for more sand bags as Jeff tries to stay ahead of the water - Picture 3747
Viewed: 1194 times.
|
[700x467] [1800x1200]
Sand bags & pumps are working as Jeff sweeps the footing clean - Picture 3746
Viewed: 1127 times.
|
[700x467] [1800x1200]
Stan, Bill & Jeff still trying to keep the water from the footing & key - Picture 3745
Viewed: 1129 times.
|
[700x467] [1800x1200]
Crew removes cables from concrete structure - Picture 3744
Viewed: 1173 times.
|
[700x467] [1800x1200]
Cables are attached to the top so they will be able to lift on footings & key - Picture 3743
Viewed: 1172 times.
|